This weekend like the first of many to come has been spent stripping out MOLLY. after 2 trips to the dump with cupboards cushions and wood, loads of wood we got her stripped out to see the full extent of the damp. We removed all of the black walls and the insulation foam that was damp and was still spitting water by using a wood chisel then left it to dry out that was day 1.